chore: sync dev up to main (dependent-job CI fix) #45

Merged
jmiller merged 2 commits from chore/sync-dev-3 into dev 2026-07-04 19:41:10 +00:00
Owner

Back-merge to bring dev even with main, propagating the dependent-job CI fix (#44). After merge dev == main.

Authored-by: Moko Consulting

Back-merge to bring `dev` even with `main`, propagating the dependent-job CI fix (#44). After merge `dev == main`. Authored-by: Moko Consulting
jmiller added 2 commits 2026-07-04 19:40:59 +00:00
ci: prevent dependent jobs from hanging when their gate is skipped
Universal: Pre-Release / Build Pre-Release (${{ inputs.stability || github.ref_name }}) (push) Has been skipped
Generic: Project CI / Lint & Validate (pull_request) Has been skipped
Universal: PR Check / Validate PR (pull_request) Has been skipped
Joomla: Metadata Validation / Validate Joomla Metadata (pull_request) Has been skipped
Generic: Repo Health / Site Health (pull_request) Has been skipped
Universal: PR Check / Branch Policy (pull_request) Failing after 1s
Generic: Repo Health / Access control (pull_request) Successful in 2s
Universal: PR Check / Secret Scan (pull_request) Successful in 5s
RC Revert / Rename rc/ back to dev/ (pull_request) Has been skipped
Branch Cleanup / Delete merged branch (pull_request) Successful in 1s
Universal: Workflow Sync Trigger / Sync workflows to live repos (pull_request) Successful in 23s
Generic: Project CI / Tests (pull_request) Has been cancelled
Universal: PR Check / Build RC Package (pull_request) Has been cancelled
Universal: PR Check / Report Issues (pull_request) Has been cancelled
Generic: Repo Health / Scripts governance (pull_request) Has been cancelled
Generic: Repo Health / Repository health (pull_request) Has been cancelled
Generic: Repo Health / Report: Scripts Governance (pull_request) Has been cancelled
Generic: Repo Health / Report: Repository Health (pull_request) Has been cancelled
393677927f
Mirror of Template-Generic fix: key dependent jobs off their gate's
result with always() so a skipped lint/validate (template repos) skips
them cleanly instead of leaving them "waiting" (Gitea act quirk).

- ci-generic.yml `test`: if always() && needs.lint.result == 'success'
- pr-check.yml `pre-release`: if always() && needs.branch-policy.result
  == 'success' && needs.validate.result == 'success'

Authored-by: Moko Consulting
Merge pull request 'ci: prevent dependent jobs from hanging when their gate is skipped' (#44) from fix/dependent-jobs-no-hang into main
Universal: Pre-Release / Build Pre-Release (${{ inputs.stability || github.ref_name }}) (push) Has been skipped
Generic: Project CI / Lint & Validate (pull_request) Has been skipped
Universal: PR Check / Validate PR (pull_request) Has been skipped
Joomla: Metadata Validation / Validate Joomla Metadata (pull_request) Has been skipped
Universal: PR Check / Branch Policy (pull_request) Successful in 2s
Universal: PR Check / Secret Scan (pull_request) Successful in 4s
RC Revert / Rename rc/ back to dev/ (pull_request) Has been skipped
Branch Cleanup / Delete merged branch (pull_request) Successful in 1s
Generic: Project CI / Tests (pull_request) Has been cancelled
Universal: PR Check / Build RC Package (pull_request) Has been cancelled
Universal: PR Check / Report Issues (pull_request) Has been cancelled
a71170addf
jmiller merged commit bbec43fb9b into dev 2026-07-04 19:41:10 +00:00
jmiller deleted branch chore/sync-dev-3 2026-07-04 19:41:10 +00:00
Sign in to join this conversation.
No Reviewers
Priority -
Type -
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: MokoConsulting/Template-Joomla#45