Commit Graph

2 Commits

Author SHA1 Message Date
jmiller aefa46e0c4 fix: use warning status when backup succeeds but remote upload fails
Universal: Pre-Release / Build Pre-Release (${{ inputs.stability || github.ref_name }}) (push) Successful in 19s
Previously a successful backup with a failed remote upload was marked
as "complete", hiding the upload failure. Now these records get a
"warning" status with a yellow badge so operators can see at a glance
which backups didn't reach their remote destination.

Warning-status records are treated as usable backups throughout:
- Downloadable, browsable, and restorable (the archive is intact)
- Counted in dashboard stats, storage totals, and success streaks
- Included in purge operations and differential base lookups
- Shown with yellow "warning" badge in list, detail, and cpanel module
- Filterable via the status dropdown on Backup Records

Claude-Session: https://claude.ai/code/session_01MbEjBtsSjPuTWhqqrMS2wG
2026-06-30 14:14:06 -05:00
Jonathan Miller 01bed8942c feat: AJAX stepped restore engine for large sites (#62)
Universal: PR Check / Branch Policy (pull_request) Failing after 1s
Generic: Repo Health / Access control (pull_request) Successful in 2s
Generic: Repo Health / Site Health (pull_request) Has been skipped
Joomla: Extension CI / Release Readiness Check (pull_request) Failing after 5s
Universal: PR Check / Validate PR (pull_request) Failing after 5s
Universal: PR Check / Secret Scan (pull_request) Successful in 6s
Joomla: Metadata Validation / Validate Joomla Metadata (pull_request) Successful in 9s
Universal: Build & Release / Promote to RC (pull_request) Has been skipped
RC Revert / Rename rc/ back to dev/ (pull_request) Has been skipped
Joomla: Extension CI / Lint & Validate (pull_request) Failing after 32s
Branch Cleanup / Delete merged branch (pull_request) Successful in 3s
Universal: Workflow Sync Trigger / Sync workflows to live repos (pull_request) Failing after 6s
Universal: Build & Release / Build & Release Pipeline (pull_request) Successful in 23s
Joomla: Extension CI / Tests (PHP 8.2) (pull_request) Has been cancelled
Joomla: Extension CI / Tests (PHP 8.3) (pull_request) Has been cancelled
Joomla: Extension CI / PHPStan Analysis (pull_request) Has been cancelled
Joomla: Extension CI / Build RC Pre-Release (pull_request) Has been cancelled
Universal: PR Check / Build RC Package (pull_request) Has been cancelled
Universal: PR Check / Report Issues (pull_request) Has been cancelled
Generic: Repo Health / Scripts governance (pull_request) Has been cancelled
Generic: Repo Health / Repository health (pull_request) Has been cancelled
Generic: Repo Health / Report Issues (pull_request) Has been cancelled
Break restore into phases (extract, files, database, config, cleanup)
executed via AJAX steps to avoid PHP timeout on shared hosting.

- SteppedRestoreEngine with session persistence
- AjaxController restoreInit/restoreStep endpoints
- Restore modal uses AJAX progress instead of synchronous submit
- Files copied in batches of 200, SQL in batches of 500

Closes #62
2026-06-22 09:27:18 -05:00