feat: scheduling, A/B testing, repo metadata update #60

Merged
jmiller merged 3 commits from dev into main 2026-06-04 15:03:36 +00:00
Owner

Add hero scheduling with start/end datetime and A/B testing with weighted random variations. Close all open feature issues.

Add hero scheduling with start/end datetime and A/B testing with weighted random variations. Close all open feature issues.
jmiller added 3 commits 2026-06-04 15:03:15 +00:00
feat: scheduling and A/B testing (#21, #22)
Generic: Repo Health / Scripts governance (push) Blocked by required conditions
Generic: Repo Health / Repository health (push) Blocked by required conditions
Generic: Repo Health / Report Issues (push) Blocked by required conditions
Generic: Repo Health / Site Health (push) Has been skipped
Generic: Repo Health / Access control (push) Successful in 2s
Joomla: Extension CI / Tests (PHP 8.2) (pull_request) Blocked by required conditions
Joomla: Extension CI / Tests (PHP 8.3) (pull_request) Blocked by required conditions
Joomla: Extension CI / PHPStan Analysis (pull_request) Blocked by required conditions
Joomla: Extension CI / Build RC Pre-Release (pull_request) Blocked by required conditions
Universal: PR Check / Build RC Package (pull_request) Blocked by required conditions
Universal: PR Check / Report Issues (pull_request) Blocked by required conditions
Generic: Repo Health / Scripts governance (pull_request) Blocked by required conditions
Generic: Repo Health / Repository health (pull_request) Blocked by required conditions
Generic: Repo Health / Report Issues (pull_request) Blocked by required conditions
Generic: Repo Health / Site Health (pull_request) Has been skipped
Universal: PR Check / Branch Policy (pull_request) Successful in 2s
Generic: Repo Health / Access control (pull_request) Successful in 1s
Joomla: Extension CI / Release Readiness Check (pull_request) Failing after 4s
Universal: Secret Scanning / Gitleaks Secret Scan (pull_request) Successful in 5s
Universal: PR Check / Validate PR (pull_request) Failing after 4s
Joomla: Extension CI / Lint & Validate (pull_request) Failing after 6s
Branch Cleanup / Delete merged branch (pull_request) Has been skipped
Universal: Build & Release / Promote to RC (pull_request) Has been skipped
Universal: Build & Release / Build & Release Pipeline (pull_request) Successful in 11s
af3acc6fd2
Add hero scheduling with start/end datetime fields using Joomla
calendar type and site timezone. Hero skips rendering outside the
configured range. Add A/B testing with weighted random variation
selection, session-sticky per module instance via subform repeatable.
Close #23 as substantially complete (animation library implemented
in prior phases). Language strings in all locales.

Authored-by: Moko Consulting
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
jmiller merged commit 9de47e9fe2 into main 2026-06-04 15:03:36 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: MokoConsulting/MokoJoomHero#60